Exterior painting.

Paint is the cheapest part of a paint job. On a house built before 1978 the expensive parts are the prep, the lead rules, and the carpentry you find once the scraping starts. Here is how to read an estimate so the cheap one does not cost you twice.

About 12 minutes. General information for River Forest homeowners. Most houses here predate the 1978 lead paint ban; federal lead-safe rules apply to any contractor disturbing painted surfaces on them. Painting itself needs no Village permit.

Swipe sideways to see the whole drawing.
  1. Cedar siding. The wood itself, often ninety years old and still sound if it has been kept painted.
  2. Lead paint. Any house painted before 1978 has it in the lower layers. Federal rules require a lead-safe certified contractor to contain and clean up dust. Ask for the certification.
  3. Prep. Scraping loose paint, sanding, spot-priming bare wood. This is most of the labor and most of the difference between a five-year job and a two-year job.
  4. Primer. Bonds the new paint to the old surface. Skipping it on bare wood is how paint peels in one season.
  5. Two topcoats. Two full coats, not one. The estimate should say two.
  6. Rotted trim. Painters find it during prep. Replacing it is carpentry, priced separately, and siding or trim replacement needs a Village permit even though painting does not.
One clapboard from a 1930s house, magnified. Old lead paint sits under everything, so containment is required; scraping and priming are most of the labor; two finish coats, not one. The rotted corner board is carpentry, priced separately and permitted.

At a glance, River Forest

Typical installed price$6,000 to $20,000
Best time of yearMay to October, above 50 degrees overnight
PermitNo. Painting is on the Village’s no-permit list. Siding, trim replacement and window replacement are permitted work.
Most common hidden costRotted trim and lead-safe containment

Ranges reflect recent River Forest and near-west-suburban work on pre-war housing. Your house, scope and season move the number. Not a quote.

Planning range

What should this cost on your block?

Pick what matches your house. The range updates and shows which choice is moving it. A planning number, not a quote: it is what an estimate in this range should look like before you get one.

House size
Most Tudors and foursquares between Thatcher and Harlem.
What gets painted
Most River Forest Tudors.
Prep
Coats
Carpentry
Installed, River Forest
$2,500 to $7,500
Base for this project$6,000 to $9,500
What gets painted: Trim only on a brick house−$3,500 to −$2,000

Prep is the price. A cheap estimate is almost always a prep estimate.

An estimate far below this range usually left something out. One far above deserves a second look. Either way, the rows below tell you where to look.

Planning figures, not a quote. Ranges are built from recent near-west-suburban work on pre-war houses and reviewed September 2026. Nobody is bound by them, and your house may legitimately fall outside them.

What River Forest houses are made of

Most houses here are brick, which means a painting job is trim: soffits, fascia, window frames, sash, porch columns, doors. A few thousand square feet of wood, much of it thirty feet up. The frame houses near Harlem and the big stucco Prairie-style houses toward the river are whole-house jobs, and stucco has its own rules.

Everything was built before 1940, so everything has been painted a dozen times. Under the current color there are layers of oil paint from the 1950s and 1960s, alligatored and failing, and under those there is lead. That history sets the price of prep, and the law sets the way it has to be done.

Prep is the job

Paint fails when the surface under it fails. New paint over loose old paint peels with it. New paint over chalky, dirty wood does not bond. New paint over bare wood without primer soaks in and fails early.

Proper prep on old trim means washing, scraping every loose edge back to a sound surface, sanding the edges feathered so they do not telegraph through, priming every bare spot, caulking the joints, and sometimes filling and sanding again. On alligatored 1950s oil paint it can mean taking whole sections back to bare wood.

That is 60 to 80 percent of the labor on a trim job. It is also the part a low estimate quietly skips, because the homeowner cannot see it. Two estimates with the same paint and a $4,000 gap are usually two different amounts of scraping.

Lead-safe rules, and why they are not optional

Under the federal Renovation, Repair and Painting rule, any contractor disturbing more than a small area of painted surface on a pre-1978 house must be certified, use lead-safe work practices, and give you an EPA pamphlet before starting. Every house in River Forest qualifies.

In practice that means plastic sheeting on the ground under the work area, no open-flame stripping, no power sanding without HEPA vacuum attachment, wet scraping where feasible, containment of chips, and cleanup verification. It slows the work down and it costs more. It is also the difference between a paint job and a lead-dust event in the garden beds where your tomatoes grow.

Ask for the company's EPA certification number and the name of the certified renovator who will be on site. A contractor who says "we do not really worry about that on exteriors" is describing a violation, not a shortcut.

Reading the estimate, row by row

Line these rows up across every estimate you collect. Where two of them differ, that is where the price difference usually lives.

Illustrative exampleThe rows worth comparing on any exterior painting estimate
Illustrative Exterior painting comparison
What to compareEstimate AEstimate B
Price$11,400Illustrative price$6,900Preliminary, subject to site verification
Prep and repairsWash, full scrape, feather sand, caulk, fill; up to 40 hours carpentry allowancePower wash, scrape loose paint
Lead-safe practicesEPA RRP certified; containment, HEPA, daily cleanupNot specified
PrimerOil-based primer on all bare woodSpot prime as needed
Paint product and coatsPremium 100% acrylic, two finish coatsAcrylic, one coat
Surfaces includedAll trim, soffits, fascia, porch, doors, garage trimTrim and soffits
Warranty5 years labor and materials2 years
Timing10 working days, June4 days

Fictional figures. The second estimate has one coat, no full prime, no lead-safe practices stated and no carpentry allowance. It will look the same the week it is done.

Prep and repairs. Spelled out step by step. "Prep as needed" is not a scope.

Lead-safe practices. Certification number, containment method, cleanup.

Primer. Which product, and where: bare wood only, or everything.

Paint product and coats. Brand and line by name, sheen, and the number of finish coats. Two is the standard for a warranty that means anything.

Surfaces included. Every surface, named. Garage, fence, porch ceiling, storm windows and the back of the house are the usual omissions.

Primer, paint and coats

Primer bonds to the surface and gives the finish coat something to grip. On bare or weathered wood, an oil-based or specialty bonding primer is standard. On sound existing paint, a full prime coat is sometimes skipped in favor of spot priming, which is legitimate if the existing paint is sound and stated.

Finish paint on exteriors here is almost always a 100 percent acrylic latex from a major manufacturer's top or second line. The product matters less than the number of coats. One coat of the best paint made covers unevenly and wears through at the edges in three years. Two coats is the job.

Sheen is a choice, not a spec. Satin on trim hides more; semi-gloss on doors and sash cleans better. Ask, but do not let it distract from coats.

Carpentry and the rot conversation

Scraping finds rot. Window sills, the bottom of porch columns, the ends of fascia boards, the corner of a soffit under a failed gutter. It is not the painter's fault and it is not optional; painting over rot seals the water in.

What matters is how the estimate handles it. The good ones carry an allowance, a number of hours or a dollar figure for carpentry, and an hourly rate beyond it. The thin ones say nothing, and the conversation happens on the third day with the crew standing there and the paint bought. Ask up front: what happens when you find rot, and what does it cost?

Epoxy consolidants and fillers handle small areas well. Larger sections get replaced, ideally with a rot-resistant wood or a composite, primed on all sides before installation.

Stucco and masonry coatings

The stucco Prairie-style houses toward Thatcher are a different job. Stucco is porous and it moves. It wants a breathable masonry coating or an elastomeric paint designed to bridge hairline cracks, not standard house paint, and cracks wider than a hairline need patching with a compatible stucco mix first.

If your stucco has never been painted, think hard before starting. Once it is coated, it is coated forever. Some owners choose a clear breathable water repellent instead. Ask a contractor who works on stucco specifically, not one who "does stucco too."

Weather, timing and the calendar

Exterior paint needs surfaces above about 50 degrees, including overnight, and dry for a day or two before and after. In River Forest that means mid-May through early October, with June and September as the reliable months. A crew booked for April is gambling on the weather with your paint.

Good painters fill their calendar early. If you want a specific month, be talking in February.

What drives the price

Surface area first: brick house trim versus full frame is a factor of two to three. Then prep condition, which sets the hours. Then height and access: a three-story Tudor with dormers needs staging that a bungalow does not. Then lead-safe containment, which adds to every day. Paint is last, and it is a few hundred dollars either way.

Warranties, and what five years covers

A painting warranty covers peeling, blistering and flaking caused by the work, not fading, not mildew, and not failure over rot or over surfaces the estimate excluded. Most run two to five years. A five-year warranty on a one-coat job is a promise the contractor does not intend to keep, or one they expect you to forget. Read the exclusions.

Red flags

  • "Prep as needed," or prep described in one line.
  • No EPA certification number, or lead rules waved off.
  • One coat, or the number of coats not stated.
  • No carpentry allowance or rate.
  • A clear sealer proposed for unpainted stucco or brick without discussion.
  • A start date in April.

Questions to ask

  • Walk me through the prep, surface by surface.
  • What is your EPA Lead-Safe certification number, and who is the certified renovator on my job?
  • Which primer, where, and how many finish coats?
  • What happens when you find rot, and what does it cost per hour?
  • Which surfaces are excluded?
  • What exactly does the warranty cover, and for how long?
  • When can you actually start, and what if it rains?

The short list

Prep spelled out. Lead certification on the page. Two coats. Carpentry allowance. Every surface named. Warranty exclusions read. That is a painting estimate you can compare, and it is the difference between a job that lasts eight years and one that peels before the next Memorial Day parade.

When to do it

Pick a month. See what the work itself needs.

Green months are when exterior painting work can normally meet the conditions below in River Forest. These are requirements of the job, not a contractor's schedule. We cannot tell you how quickly any company will get to you.

  • 50°F or above, surface and airMost exterior coatings will not form a film below their minimum temperature. Check the product data sheet, not the weather app.
  • Dry, and dry afterSurfaces need to be dry going on, and the coating needs hours without rain. Wet wood under new paint is what peels next year.
  • Stop before the dew point · not in OctIn spring and fall, a late-afternoon coat can be wet with dew before it sets. Crews should quit early in those months.
  • Lead-safe work, pre-1978 housesSanding or scraping old paint requires certified containment. Most River Forest houses are old enough for this to apply.
  • Prep written downThe estimate should say how much scraping, priming and carpentry is included. Prep is the whole job and it is where cheap bids differ.
Starting in Oct
Workable, with compromises
Workable

In Oct, this does not hold: Stop before the dew point.

If nothing is failing, Jun is the next month these conditions normally line up.

Two houses painted the same summer can look nothing alike three years later. The difference is prep, written into the estimate.

Weather windows for the near west suburbs. Dates, availability and how long the work takes are between you and the contractor. See Timing and availability.

Before you sign

The exterior painting estimate checklist.

Put the estimate next to this and tick what you can find on the page. Anything unticked is a question for the contractor, not a reason to walk. Ticks save in this browser; print it for the kitchen table.

0 of 14
  1. Specific to exterior painting
  2. On every estimate, any trade

Village line for this trade: No. Painting is on the Village’s no-permit list. Siding, trim replacement and window replacement are permitted work.

Permits, programs and the Village

What the Village of River Forest says

  • “Wall coverings, painting” is exempt.
  • Rotted trim replaced during prep is carpentry; siding and window replacement require a permit. If the painter’s scope includes them, the permit belongs on the estimate.
  • Scaffolding or a lift on the public sidewalk needs a permit.
  • Federal lead-safe rules for pre-1978 houses apply regardless of Village permitting.

Summarized from Village of River Forest permit sheets, engineering details and resident assistance program packets. Rules and fees change; confirm with the Building Department at (708) 714-3552 before you sign. Full detail under Village information.

Read nextGutters and downspouts.Five inch versus six inch, seamless aluminum, where the water goes when it leaves the downspout, and gutter guards.